Project Links
Katahdin Woods and Waters National Monument » Development of a Monument-wide Programmatic Agreement » Document List » Document Contents
Final Monument wide Programmatic Agreement
This PA was executed on December 13, 2024. It lays out the process by which Sections 106 and 110 of the National Historic Preservation Act will be carried out at the Monument. It was developed in consultation with the Maine State Historic Preservation Office, Penobscot Nation, Passamaquoddy Tribe-Motahkomikuk, Passamaquoddy Tribe-Sipayik, Mi'kmaq Nation, and Houlton Band of Maliseet Indians.
Document Content: |
20241211KAWW_PA_Final.pdf
(1.1 MB, PDF file)
20240603 NPS signature page.pdf
(413.7 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |