Project Links
New River Gorge National Park and Preserve » GAOA- Demolition of Historic and Excess Structures » Document List » Document Contents
Pre-NEPA Report
Pre-NEPA report for the New River Gorge National Park and Preserve Excess Structure Demolition project
Comment Period:
Closed
Dec 13, 2023 - Jan 15, 2024
|
Document Content: |
NERI-RemoveExcessStructures_Pre-NEPAReport_2023-12-12_508.pdf
(10.2 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |