Project Links
Mount Rushmore National Memorial » Air Tour Management Plan - Mount Rushmore National Memorial » Document List » Document Contents
Mount Rushmore Draft ATMP, EA and FAQs
Mount Rushmore Draft ATMP and EA
Comment Period:
Closed
May 16, 2023 - Jun 20, 2023
|
Document Content: |
ATMP Environmental Assessment
(6.6 MB, PDF file)
Draft ATMP and EA FAQs
(173.7 KB, PDF file)
ATMP EA Appendices
(20.2 MB, PDF file)
Draft ATMP
(2.3 MB, PDF file)
Draft ATMP and EA Presentation
(2.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |