Signed CE - Replace the Upper McDonald Creek Bridge and Formalize Parking at Upper McDonald Creek Trailhead


A categorical exclusion (CE) for the redesigned construction plan to replace the Upper McDonald Creek Bridge in Glacier National Park was signed September 12, 2022. The signed CE and associated documentation is posted below.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.