Summary Pages from Revised Foundry Branch Phase IA Archaeology Report June 6 2022 508 Compliant


This document - - Summary Pages from Revised Foundry Branch Phase IA Archaeology Report - - is an extract from the report PHASE IA ARCHAEOLOGICAL ASSESSMENT OF the Foundry Branch Trestle Bridge Demolition, Washington, DC

DC HPO Archaeological Report No. 848

Authored by:
Jean M. Cascardi, RPA

Submitted to:
Washington Metropolitan Area Transit Authority
600 5th Street NW
Washington, District of Columbia 20001

Prepared by:
Rummel, Klepper & Kahl, LLP
700 East Pratt Street, Suite 500
Baltimore, Maryland 21202
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.