Project Links
Kennesaw Mountain National Battlefield Park » Wallis House » Document List » Document Contents
Signal Hill and Field Hospital at the Wallis Farm CLR EA
Environmental Assessment for the treatment described in the Cultural Landscape Report for the Signal Hill and Field Hospital at the Wallis Farm
Comment Period:
Closed
Nov 29, 2021 - Dec 29, 2021
|
Document Content: |
KEMO_WallisFarmEA_CameraReady_2021-10-29_508compliant.pdf
(19.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |