Project Links
Gates Of The Arctic National Park and Preserve » Ambler Mining District Industrial Access Project EEA » Document List » Document Contents
Final Right-of-Way Permit
Right-of-Way Permit for the full length of the Ambler Road signed by NPS, BLM and AIDEA on January 6, 2021
Document Content: |
NPS Ambler ROW Grant FINAL Signed 1.5.20.pdf
(19.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |