Project Links
Gates Of The Arctic National Park and Preserve » Walker Lake Retaining Wall Removal Project » Document List » Document Contents
Environmental Assessment on the Walker Lake Retaining Wall Removal Project
Environmental Assessment on the Walker Lake Retaining Wall Removal Project
Comment Period:
Closed
Apr 16, 2002 - May 16, 2002
|
Document Content: |
Environmental Assessment on the Walker Lake Retaining Wall Removal Project
(920.1 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |