Project Links
Pipestone National Monument » Demolish Buildings 3 and 6 and Restore to Natural Conditions » Document List » Document Contents
Project Description
Description of the project with photos.
Comment Period:
Closed
Jul 27, 2020 - Aug 28, 2020
|
Document Content: |
Project Description with Photos.pdf
(2.0 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |