The Finding of No Significant Impact (FONSI) was signed by NPS Regional Director Christine S. Lehnertz on August 8, 2011. The NPS selected Alternative 4: Implement Bighorn Sheep Research and Monitoring with Translocations.

The EA was available for public review and comment during a 38-day period from June 14 to July 21, 2011. A number of substantive comments were received on the EA. These have been addressed in the Errata. Substantive comments requiring an agency response regarding these concerns and/or editorial clarification or corrections to the EA are documented in an Errata prepared as a technical attachment to the EA.

* indicates the current step in the planning process
Step 1. Define the purpose and need, and planning objectives
Step 2. Conduct public scoping
Step 3. Develop alternatives and analyze effects
Step 4. Select a preferred alternative
Step 5. Public review of environmental assessment
Step 6. Analyze public comment
Step 7. Prepare decision document
Step 8. Notify public of decision *
Step 9. Implement selected alternative