Purpose and Need:
Cattle Point Road is the only road access to the east end of the Cattle Point peninsula, which is home to about 270 residents. A 500-foot section of Cattle Point Road is threatened by coastal erosion. Coastal wind and wave action is eroding the base of the bluff that supports the road at a rate of about 0.86 feet per year; however, larger sections of the bluff have the potential to slide during a major storm. The proposed project would maintain vehicular access for residents and visitors without threat of road failure from coastal erosion.
The DEIS is available for a 60-day public review and comment period which begins September 3, 2010 and ends November 2, 2010. During this time, the agencies will accept comments from the public and agencies interested in the proposed project. These comments will be considered and evaluated by the agencies and incorporated into a Final EIS, which will be prepared prior to making a final decision on the project.