Comment period closes
May 30, 2026
 
at 11:59 PM Mountain Time in
Days, Hours, Min.

2026 White River State Route 410 Flood and Erosion Risk Reduction Environmental Assessment


The National Park Service has prepared an environmental assessment (EA) evaluating a proposal from the Washington State Department of Transportation to address near-term flooding and erosion risks to State Route 410 within Mount Rainier National Park. As described in the EA, two engineered log structures would be installed within the White River floodplain. The engineered log structures would be installed outside of the current road prism within the adjacent Mount Rainier Wilderness. The proposed project is intended to preserve access to and through Mount Rainier National Park via the northeast entrance of the park.

Public comments on the EA will be accepted from April 30 through May 30, 2026.

A version of this EA compliant with Section 508 of the Rehabilitation Act will be released as soon as possible.
 
Comment Period: In Review        Apr 30, 2026 - May 30, 2026
Comment period closes May 30, 2026 at 11:59 PM Mountain Time in:
Days, Hours, Min.
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.