Curry Village-Install Path of Travel and Enlarge 11 Tents to meet ADA Standards

Yosemite National Park » Curry Village-Install Path of Travel and Enlarge 11 Tents to meet ADA Standards » Document List

This project has two phases to insure compliance with ADA standards:
Phase I: Rebuild 11 selected tents to increase their current size to a 12ft by 14ft tent for ADA visitor access (Curry Village tent area nearest registration desk. Effected tents are #6, 7, 9, 10, 11, 13, 15, 19, 21, 22, 23). Tents are installed on concrete piers.

Phase II: Provide asphalt path of travel to 5 of the rebuilt ADA tents (10, 11, 13, 15, 19) which meets ADA standards. Work includes scaping and grading soil as needed to meet required path specifications.