Project Links
Rehabilitate Cleetwood Trail and Repair Failing Facilities at Cleetwood Marina
Crater Lake National Park » Rehabilitate Cleetwood Trail and Repair Failing Facilities at Cleetwood Marina » Document List
This project will address critical safety issues with the Cleetwood Cove Trail and Marina. Work proposed includes:
(1) Rehabilitation of the entire 1.1 mile trail including improvements to trail tread and retaining walls.
(2) Rockfall scaling and mitigation along identified high risk zones.
(3) Removal and replacement of the failed bulkhead/dock with a structurally stable marina.
(4) Replacing the outdated and undersized composting toilets located near the marina.
The planning, design, and compliance are completed for this project. The next step is solicitation of the construction contract.
The park is planning on starting construction in 2026. Due to the extent work to be completed and short construction seasons, trail closures will be required and are expected during the duration of the 2027 and 2028 summer seasons. During this time, no boat tours will be provided and the trail will be closed due to construction and rockfall hazards. If construction goes as planned, the renovated trail will reopen in summer 2029.
Contact Information
Sean Denniston541-594-3008