Project Links
Metacomet Monadnock Mattabesett Trail Feasibility Study
Northeast Regional Office » Metacomet Monadnock Mattabesett Trail Feasibility Study » Document List
Primary Goal - To determine the best way to ensure the long-term viability of a continuous public-use trail system from Long Island Sound through Connecticut to the Massachusetts/New Hampshire border.
Secondary Goal - To determine whether or not designation as a National Scenic Trail makes sense as a means of achieving the primary goals of trail system viability.
In addition, the study had four guiding principles:
1. Meaningful investigation of the trail system's long-term viability can only occur with involvement of a wide range of trail advocates, landowners, and other interested parties;
2. Emphasis will be on strengthening existing trail system partnerships and characteristics of use, maintenance, ownership, and voluntary stewardship;
3. Respect for private property rights is a fundamental component of a successful project; and
4. Federal condemnation of land will not be considered as an option in establishing or protecting the trail system.