The project will install an underground water pipeline from an existing well, managed jointly by the National Park Service (NPS) and the Bureau of Land Management (BLM) but on BLM Lands, to the NPS Dellenbaugh Administrative site within GCPNM. The project includes installation of a photovoltaic (PV) electrical system and well house at the wellhead. The pipeline would be installed through BLM Lands and connects with existing underground tanks and an existing pumphouse at Dellenbaugh Admin Site. A new water purification system will be built inside the existing pumphouse. The Monument is jointly managed under Service First Authority by NPS and BLM; the two agencies have collaborated on the project design, impact analysis, and mitigation.
Contact Information
Paul Krumland
435-688-3299