Project Links
Develop Water Supply to Augment Annie Springs
Crater Lake National Park » Develop Water Supply to Augment Annie Springs » Document List
The National Park Service (NPS) proposed utilizing an existing exploratory well as a new ground water source for potable water that can either supplement the Annie Springs surface water source or provide a sole source of supply to the park water system should Annie Springs not be available. This action is needed to ensure a safe, reliable water supply for domestic and commercial uses at these facilities. The purpose of this action is to supplement the Annie Springs source in CRLA to ensure sufficient water for human consumption, sanitation, life safety, and fire protection, including historic structure protection.
The compliance process for this project was completed with the signing of a Finding of No Significant Impact (FONSI) for the selected action.The Production Well with Pipeline along Original Highway Alignment Alternative is the NPS Selected Action as detailed in the Environmental Assessment released in March 2016 (available for download from this site). No substantive comments were received during public review that required the EA to be modified.
The Finding of No Significant Impact for the Augment Annie Springs Water Supply and Install PCT Site Improvements is available for review by clicking the "Document List" link on the left of the screen.