This project will remove two unserviceable 5-ton HVAC air handling units from the visitor center building and replace them with two roof mounted air units of equivalent size. This change will require the reconfiguration of the duct work inside the building and improving the flow of conditioned air within the structure. The proposed changes will increase efficiency and better serve the public that uses the building.