Merced River Plan Implementation: Wawona Swinging Bridge Vault Toilet Installation
Yosemite National Park » Merced River Plan Implementation: Wawona Swinging Bridge Vault Toilet Installation » Document List
The unit will be placed to minimize site work and site disturbance; no utility work will be necessary. Excavation to approximately 5 feet in depth will be necessary for placement of the waste vault; the excavation footprint should not exceed approximately 15 feet by 20 feet. Site grading will include only minimal dressing of the grade in the direct vicinity of the unit to facilitate proper drainage and accessibility after placement of the unit. No other work is anticipated.