Project Links
Wawona School New Play Structure Installation
Yosemite National Park » Wawona School New Play Structure Installation » Document List
The area where the structure will be located is the site of the existing swing and jungle-gym and is previously disturbed ground.
Construction will require over twenty footings approximately 20 inches deep, which will be dug by hand or light auger. The holes will be similar to the Yosemite Elementary School footings – as the structure is built by the same vendor.
Construction time will be late August and early September. Labor will be provided by community volunteers, Yosemite Rotary and UC Merced Rotaract clubs (a student division of Rotary).