The scope of this project would include removing the deteriorated shake roof and replacing it with a Sugar Pine Shake roof to match the original. Failed logs and roof sheeting in the roof structure would be repaired or replaced while exposed. All coverings of interior wall surfaces would be removed to allow the clean-up of rodent debris, installation of 1/4" hardware cloth for rodent exclusion and to insulate wall cavities. All interior wall coverings will be replaced with in-kind materials, [Celotex fiber board] to match original. Repairs will be made to bear damaged sections of the exterior wall surfaces composed of Sugar Pine Shakes and vertical logs. Deficiencies in the dry laid stone perimeter foundation will be addressed. All replacements of historic fabric will be made with in-kind materials.