Repair and Stabilize the York River Shoreline to Protect the Colonial Parkway

Colonial National Historical Park » Repair and Stabilize the York River Shoreline to Protect the Colonial Parkway » Document List

This Wetlands statement of findings has been prepared to comply with Executive Order 11990. The Repair and Stabilize the York River Shoreline to Protect the Colonial Parkway Environmental Assessment 2012 (EA) for the Repair and Stabilize the York River to Protect the Colonial Parkway project includes a phased approach to completing the entire project. As described in the EA, future statements of findings will be prepared on a phase-by-phase basis as preliminary design plans are advanced to construction-ready documents. In a Finding of No Significant Impact (FONSI), the NPS selected the alternative for repairing and installing shoreline stabilization along the York River to protect the Colonial Parkway.

Contact Information

Dorothy Geyer, 757-898-2433