The project is to replace the feeder line from the switchboard at the Wawona Hotel that goes to each individual building in the hotel complex. The Hill Studio is still connected to the existing switchgear. The switchboard has been removed and a new pedestal for use for Hill Studio has been placed adjacent to the new switchgear and transformer. PG&E will not reconnect the feeder line to new pedestal because the feeder line was not upgraded during the Wawona Hotel project (PEPC 60760). The current feeder line is a cluster of cables that was direct buried in the ground, so there is no conduit to pull out the existing wires nor pull the new line from the meter to the building.
We are working with PG&E for the best solution to restore power to Hill Studio (Building 4414)