Project Links
Verizon Power and 4G Upgrade at Crane Flat Helibase
Yosemite National Park » Verizon Power and 4G Upgrade at Crane Flat Helibase » Document List
There are future plans to run commercial power to the Crane Flat helibase, however an interm solution is needed before the end of 2022 in order to maintain Verizon's cell presence. Verizon proposes to install two 60kW generators and propane tanks to provide enough power to operate the proposed new Verizon equipment only. Once commercial power is installed at the site the generators and propane tanks would be removed.