Port Oneida Environmental Assessment


The environmental assessment (EA) describes and analyzes alternative locations for a visitor contact station and employee housing, and alternative means of improving visitor access, and interpretation of Port Oneida resources. In all alternatives rehabilitation and stabilization of historic structures, and stabilization of cultural landscapes occur at Port Oneida.

A FONSI for the Port Oneida Historic Landscape Management Plan/Environmental Assessment was signed January 17, 2012.
 
Comment Period: Closed        Sep 17, 2007 - Oct 19, 2007
Document Content:
Port Oneida EA (Part 1)   (1.6 MB, PDF file)
Port Oneida EA (Part 2)   (2.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.