FONSI Fall River Entrance Improvements


The Director of the Intermountain Region, National Park Service, has signed a decision document that will enable Rocky Mountain National Park to implement improvements to the Fall River Entrance Station. The selected alternative adds a fast-pass lane, reconfigures the existing entrance and exit lanes, replaces all existing buildings with newly constructed ones having updated equipment and systems for ventilation and technology, improves the accessibility of all entrance facilities, and adds new parking spaces and pedestrian paths.

Sincerely,




Darla Sidles
Superintendent

Contact Information:
Cheri Yost (970) 586-1320
 
Document Content:
Fall River Entrance Signed FONSI.pdf   (1.3 MB, PDF file)
ROMO_FONSI_508_compliant.pdf   (214.6 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.