Project Links
Rocky Mountain National Park » Reroutes and Repairs to Flood Damaged Trails » Document List » Document Contents
Revisied Reroutes & Repairs to Flood Damaged Trails EA
Based on public comments and input from the Rocky Mountain National Park Leadership Team, the EA has been revised. Revisions were made to the alternatives descriptions for the Aspen Brook and Twin Sisters Trails. A total of four (4) paragraphs have been changed. No other changes have been made to the EA.
Document Content: |
Revised Reroutes _ Repairs to Flood Damaged Trails EA.pdf
(5.2 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |