Parkplanning and PEPC will be offline for Data Center maintenance from 1:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

FINDING OF NO SIGNIFICANT IMPACT- Final Uplake Development Concept Plan/Environmental Assessment and Determination of Effect


Adobe format(PDF) posting of Finding of No Significant Impact (FONSI) for the Final Uplake Development Concept Plan (DCP)/Environmental Assessment(EA)and Determination of Effect (DOE)for public record.

Draft Uplake DCP and EA (July 2006) posted for errata reference also. (LARGE Adobe FORMAT PDF FILE AT 17 mb)
 
Document Content:
Draft Uplake DCP and EA (July 2006)Draft Uplake DCP and EA (July 2006)   (16.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.