COMMENT PERIOD EXTENDED FOR 30 DAYS - DEIS Avalanche Hazard Reduction by Burlington Northern Santa Fe Railway in Glacier National Park and Flathead National Forest, Montana


Draft EIS
 
Comment Period: Closed        Oct 23, 2006 - Jan 29, 2007
Document Content:
Dear Friends Letter   (29.0 KB, Word file)
Title Page and Executive Summary   (420.4 KB, PDF file)
Chapter 1   (942.5 KB, PDF file)
Chapter 2, Part A (Alternatives)   (2.9 MB, PDF file)
Chapter 2, Part B (Alternatives)   (3.4 MB, PDF file)
Chapter 3   (3.3 MB, PDF file)
Chapter 4   (814.1 KB, PDF file)
Chapter 5   (135.0 KB, PDF file)
Chapter 6   (105.8 KB, PDF file)
Appendix A Part 1   (3.8 MB, PDF file)
Appendix A Part 2   (3.5 MB, PDF file)
Appendix B   (114.3 KB, PDF file)
Appendix C Part 1   (4.2 MB, PDF file)
Appendix C Part 2   (1.2 MB, PDF file)
Glossary   (45.5 KB, PDF file)
Index   (53.8 KB, PDF file)
Back Inside Cover   (35.4 KB, PDF file)
Spine   (18.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.