Construction of Park Housing at East Glacier and Swiftcurrent Developed Areas Environmental Assessment


Glacier National Park is proposing to construct replacement park employee housing in the Swiftcurrent housing area at Many Glacier and the NPS developed area at East Glacier. Please follow the link below to review the document.

Please note that this EA reflects changes that have been made to the standard content of NPS EAs as a result of a revised Director's Order 12 (DO-12) Handbook approved in 2015, and does not contain some of the sections you have seen in past EAs issued by Glacier. Notable changes are: NPS EAs no longer need thresholds or intensity definitions for the impact analysis and no longer need to identify an environmentally preferable alternative. If you have questions about these changes, go to http://www.nature.nps.gov/environmentalquality/planning.cfm or contact Mary Riddle, Glacier National Park Chief of Environmental Planning and Compliance, at 406-888-7898.
 
Comment Period: Closed        Dec 17, 2015 - Jan 19, 2016
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.