Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Belly River Improvements


Glacier National Park is proposing to make improvements to the water, sewer and propane utility systems at the Belly River Ranger Station Historic District. The existing systems are obsolete, inadequate, and environmentally unsafe. They were installed between 1927 and 1959, the same period the buildings were constructed. The park proposes to replace the existing water line, construct a central septic system, and construct a central propane system.
 
Comment Period: Closed        Feb 2, 2006 - Mar 17, 2006
Document Content:
PEPC Belly River Dear Friends LetterPEPC Belly River Dear Friends Letter   (24.0 KB, .doc file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.