Draft General Management Plan and Environmental Impact Statement


This is the Draft General Management Plan and Environmental Impact Statement for Cedar Creek and Belle Grove National Historical Park.

For those of you with a fast connection, we have provided the entire document as a 13 mb file. If you have a slower connection or want to review only certain chapters, the document is also provided as smaller, separate files.

You are encouraged to provide your comments in writing through this web site. If you prefer to write a comment letter, however, you may send it to Superintendent, Cedar Creek and Belle Grove NHP, P.O. Box 700, Middletown, VA 22645.

We will accept comments on the Draft GMP until February 27, 2009.
 
Comment Period: Closed        Nov 6, 2008 - Feb 27, 2009
Document Content:
Draft GMP/EIS - entire document   (13.0 MB, PDF file)
Draft GMP/EIS - Intro & Chapter 1   (2.3 MB, PDF file)
Draft GMP/EIS - Chapter 2   (1.3 MB, PDF file)
Draft GMP/EIS - Chapter 3 (partial)   (5.2 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.