Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
existing interior view of Washington Circle

2012 Updates to the Plan


Based on further consultation between DDOT and NPS, as well as consultation with the District State Historic Preservation Office (SHPO) and staff from the National Capital Planning Commission and Commission of Fine Arts, the plans for Washington Circle have been further revised. The updates are to protect mature, character-defining trees, to accommodate pedestrian safety measures, and to achieve visual harmony.
 
Document Content:
2012 Updated Plan2012 Updated Plan   (442.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.