PEPC and Parkplanning will be offline Weds. November 13th starting at 7:00 AM MT for scheduled maintenance. Expected downtime is up to four hours. Please plan and save your work accordingly.

11 st NPS FONSI


The District of Columbia Department of Transportation (DDoT) is planning the redesign and reconstruction of the 11th Street Bridge complex. The project is a design/build project that requires new alignments, abutments and right-of-ways and the taking of National Park Service property (in Anacostia Park) that goes beyond the existing transportation rights-of-ways. The project poses numerous challenges and impacts to park resources, visitors and operations.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.