Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
The San Gabriel Mountains, Devil's Punchbowl, and the West Fork of the San Gabriel River.

*Final Study Documents


The final San Gabriel Watershed and Mountains Special Resource Study was transmitted to Congress on April 10, 2013. The final study report is comprised of the following three documents:

1. Finding of No Significant Impact (including selected alternative)
2. Errata/Technical Corrections to the Draft San Gabriel Watershed and Mountains Special Resource Study
3. Draft San Gabriel Watershed and Mountains Special Resource Study and Environmental Assessment (2011)

The NPS has also prepared a summary report of the final recommendations.
 
Document Content:
Final Summary NewsletterFinal Summary Newsletter   (8.2 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.