Environmental Assessment for the Pigeon Roost Creek Bridge Replacement


At the Natchez Trace Parkway, the National Park Service, in cooperation with the Federal Highway Administration, proposes to replace the Parkway bridge over the Pigeon Roost Creek. This action is needed because the existing bridge is rapidly deteriorating. The Action Alternative includes the demolition of the existing bridge, the construction of a detour, and the construction of a new bridge.
 
Comment Period: Closed        May 1, 2007 - May 31, 2007
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.