Final - Newfound Gap Road Scenic Byway Corridor Management Plan


The final Newfound Gap Road Scenic Byway Corridor Management Plan was prepared following a 30 day public comment period. Comments received were reviewed and considered in the preparation of this final document. Appendix B summarizes the public comment process. March 2017.
 
Document Content:
NewfoundGapRd_CMP_March 2017.pdf   (35.7 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.