Floodplain Statement of Findings (FSOF), 2015 General Management Plan/East Everglades Wilderness Study


In accordance with Executive Order 11988 and Director's Order 77-2: Floodplain Management, a Floodplain Statement of Findings (FSOF) was prepared as part of the 2015 General Management Plan/East Everglades Wilderness Study (GMP/EEWS). Through coordination with the NPS's Water Resources Division in March 2022, this FSOF remains valid for the Gulf Coast Site Plan and Maintenance Dredging Environmental Assessment.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.