Project Links
Everglades National Park » Recirculation and Adoption of the Central Everglades Planning Project Final Environmental Impact Statement (FEIS) » Document List » Document Contents
EPA Federal Register Notice of Availability of CEPP EIS - December 2, 2016
U.S. Environmental Protection Agency Notice of Availability of the CEPP Final EIS. Publication of this notice in the Federal Register on December 2, 2016 began a 30-day recirculation period for the CEPP EIS.
Document Content: |
EPA Federal Register Notice _NPS Adoption of CEPP FEIS_12.2.2016.pdf
(193.8 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |