Project Links
Everglades National Park » Acquisition of Florida Power and Light Company Lands in the East Everglades Expansion Area » Document List » Document Contents
FPL agreements with NPS, USACE, SFWMD and State of Florida for relocated corridor
This folder contains:
* July 2008 FPL / NPS Contingent Agreement for Exchange of Lands,
* August 2008 FPL / U.S.Army Corps of Engineers Agreement for relocating FPL's corridor onto USACE lands and for flowage, bridge, channel and construction easements for the Tamiami Trail Bridge
* August 2008 FPL / State of Florida Agreement for relocating a portion of FPL's corridor onto State of Florida lands north of Tamiami Trail
* September 2008 FPL/South Florida Water Management District Agreement to relocate FPL's Corridor
* Map showing the proposed relocated corridor with underlying land ownerships
Document Content: |
FPL / SFWMD Corridor Relocation Agreement Sep 2008
(9.9 MB, PDF file)
FPL / USACE Agreement for relocating FPL's corridor to USACE lands
(10.2 MB, PDF file)
NPS FPL Contingent Agreement to Exchange Lands July 2008
(17.2 MB, PDF file)
FPL / State of Florida Corridor Relocation Agreement Aug 2008
(2.2 MB, PDF file)
Relocated FPL Corridor Map with Underlying Ownerships
(1.0 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |