Tamiami Trail Next Steps construction. The contractor installing Best Management Practices, such as turbidity barriers, east of Coopertown (Photo: F&J Engineering)

Memo to File_Turbidity Monitoring for Construction of Tamiami Trail 2.6 mile Bridge Project_May 25, 2017


May 25, 2017 Memo to File authorizing the use of drones instead of airboats to carry out turbidity monitoring required for construction of the Tamiami Trail Next Step Phase 1 bridges.
 