Tamiami Trail Next Steps construction. The contractor installing Best Management Practices, such as turbidity barriers, east of Coopertown (Photo: F&J Engineering)

Tamiami Trail Modifications: Next Steps Project-Adequacy of National Environmental Policy Act Documentation, May 8, 2014


The Confirmation of Previous Analysis to the Tamiami Trail Modifications: Next Steps
Project (Next Steps Project) specifically addresses whether the modifications recommended by the Value Analysis (VA) Workshop held on December 9-13, 2013 are consistent with the impacts and benefits analyzed and documented in the Final Environmental Impact Statement (2010 FEIS) for the 2.6-mile bridge component of the project's authorized plan, Alternative 6e. The National Park Service (NPS) completed the FEIS and signed the Record of Decision (ROD) for the Next Steps Project authorized plan on April 26, 2011.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.