Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Draft Environmental Assessment, Allow Construction of New Structure at High Point Reserved Estate


This environmental assessment (EA) analyzes potential impacts to the human environment resulting from two alternative courses of action within the reserved estate at the High Point Compound. These alternatives are: Alternative A (No action); Alternative B (Allow new construction per plans approved by NPS). Alternative B is the environmentally preferred alternative. Alternative B is the NPS preferred alternative. The impacts from Alternative B range from "negligible" to "negligible to minor." Alternative B will not impair park resources or values.
 
Comment Period: Closed        Feb 2, 2009 - Mar 6, 2009
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.