Install Emergency Generator at Convoy Point


This project will be installing a larger emergency generator at the park convoy Point Headquarters. The generator will be placed on a 6 inch thick 10 foot by 20 foot concrete Pad. The concrete pad will be located on the small grass area between the existing Administration and Maintenance buildings. Most of the grass and roots will be scraped away before pouring the concrete
 
Comment Period: Closed        Dec 15, 2009 - Jan 15, 2010