Joint Curatorial Collections Facility Environmental Assessment


This environmental assessment examines two alternatives; the No Action Alternative and the National Park Service Preferred Alternative. The Preferred Alternative considers the construction of a Joint Curatorial Collections Facility in Townsend, Tennessee. This facility would serve as a curatorial and storage site for National Park Service museum collections from Andrew Johnson National Historic Site (ANJO), Big South Fork National River and Recreation Area (BISO), Cumberland Gap National Historical Park (CUGA), Great Smoky Mountains National Park (GRSM), and Obed Wild and Scenic River (OBED). The facility will also store and make available archival collections from GRSM.
 
Comment Period: Closed        Aug 15, 2011 - Sep 16, 2011
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.