Vehicles on Glacier Point Road switchbacks

Glacier Point Road Rehabilitation Fact Sheet


Summary of Glacier Point Road Rehabilitation Project actions and FAQs.
 
Comment Period: Closed        08/12/2019 - 09/19/2019
Document Content:
20190808_GP Road Fact Sheet3.pdf20190808_GP Road Fact Sheet3.pdf   (181.9 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.