Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Cell Phone Tower with Fiber-optic Connection - Scoping


The National Park Service (NPS) is considering the issuance of a right-of-way permit to Verizon Wireless to install a cellular telecommunications tower. The project will also require fiber optic connections so a separate right-of-way permit is being considered for South Central Communications. The NPS is required by the Telecommunications Act of 1996 to consider all applications for the installation of wireless communication facilities on NPS lands. We welcome your input!
 
Comment Period: Closed        Sep 29, 2017 - Oct 30, 2017
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.