Project Links
Bryce Canyon National Park » Rehabilitate the Main Water System » Document List » Document Contents
BRCA Rehabilitate the Main Water System
Bryce Canyon pumps, stores, treats, and delivers approximately 16 million gallons of freshwater per year to serve over 2.5 million visitors, employees, and contractors. The purpose of this project is to address deferred maintenance of several critical system components of the Park's main water system. In addition to increasing storage capacity, these improvements will also protect the Park water system by replacing components at the end of their useable life and improving the ability to provide proactive. cost efficient system repair.
Comment Period:
Closed
Nov 13, 2024 - Dec 13, 2024
|
Document Content: |
BRCA 318695_Newsletter 1_20241108_508.pdf
(7.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |