Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
Park visitors walking west along the Promenade. The Aquatic Park bleachers at to the right, the Park's Hyde Street Pier is at left, in the distance.

Alternative B1, Preferred Alternative: Photo Rendering


Alternative B1
Preferred Alternative
Photo Rendering

Remove State Beltline Railroad Tracks and Replace with Concrete Pavement (Excluding Upper Fork) and Connect Promenade to Van Ness Avenue, Forming Accessible Multi-use Path

1/30/14
 
Comment Period: Closed        Jan 31, 2014 - Apr 30, 2014
Document Content:
Promenade_Alt_B1_Photo.JPGPromenade_Alt_B1_Photo.JPG   (5.2 MB, Image file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.