PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Letter Soliciting Scoping Comments


The letter and the three figures posted below were mailed to the Seashore's mailing list on June 20, 2013.
 
Comment Period: Closed        Jun 20, 2013 - Aug 7, 2013
Topic Questions:
1. What issues do you think should be addressed in the environmental review of the wireless communication facility Verizon proposes for Point Reyes Hill?
2. What alternatives to the wireless communication facility Verizon is proposing should be considered in the environmental review?
Document Content:
Verizon Proposal Scoping Letter   (74.8 KB, PDF file)
Figure 1: Vicinity Map   (1.1 MB, PDF file)
Figure 2: Project Features   (649.6 KB, PDF file)
Figure 3: Visual Simulations   (1.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.